HOME / THE PROJECT
Basic Sanitation
Previous slide
Next slide
BASIC SANITATION
Regarding basic sanitation, our project contemplates interventions divided into two stages:
• Construction Stage: The relocation and dredging of the Ahuyama Canal were performed between Carrera 1 and Carrera 38. We also worked on the recovery of the surrounding terrain on the East side of the channel, therefore guaranteeing all the operative hydraulic conditions for one of the main components of rainwater drainage in Barranquilla.
• Operation and Maintenance Stage: The concessionaire develops maintenance activities on the channel’s surrounding area with a maximum width of 10 meters.
- Solid Waste Management
- Concrete Work Management and Construction Materials
- Conservation and Stability Restauration of Sloped and Embankments
- Water Protection and Management
- Management and Recovery of Plant Covers